The hanging rods came out, a plywood desktop went in, and a few days of patching and painting later the closet had become a place to work.
- Built
- September 2026
- Time to build
- About a week
- Desktop
- Cabinet-grade birch plywood
- Previous tenant
- A decade of stuff
The build

Before: an ordinary closet.

Emptied out, rails still up.

Off to the lumber yard for a sheet of birch.

Measure twice, cut once.

Rails out, desktop going in.

Wall to wall.

The prep continues...

Desktop in, back wall next.

10 years of storage means lots of prep needed.

Taped off for paint.

Fresh paint.